Skip to content
Fort Lauderdale, FL · Licensed across FloridaMon–Fri 10:00 AM – 6:00 PM · (954) 807-3208
Romco Roofing — Florida KeysCall

Roofs we work on · Tile Roofs

Heavy, Handsome, and Demanding at These Wind Speeds

Tile appears throughout the Keys and it asks more of a building here than it does further north. Fastening is the whole conversation, and the underlayment beneath decides when the roof needs doing.

Give us the mile marker, tell us what is on the roof now, and say whether the property is rented out. Those three shape the job.

Metal

Down here it is the normal answer, not the upsell

Load path

At these wind speeds the covering is not the real question

Out too

The old roof has to travel the whole chain to leave

Licensed

A licensed Florida general contractor

Fastening specified for a gentler county

Tile stays on the roof because of how it is attached, and the attachment requirement climbs with the design pressure. A specification that is entirely correct in central Florida is not automatically correct in Monroe County, and this is exactly the sort of detail a contractor carries with them from wherever they usually work. The tile looks identical either way. What differs is what is holding it down and how much of it is holding it down.

What has to be settled on a Keys tile roof

  • The fastening schedule required at this location, not a general one.
  • Whether the structure is comfortable carrying the weight.
  • Underlayment condition, which is what usually ends the roof.
  • Realistic salvage rate if tiles are being lifted and relaid.
  • Whether the profile is still made, if some cannot be reused.

Weight is a real consideration here

Tile is heavy, and on an elevated or older structure that weight is a genuine question rather than a formality. It is one of the reasons metal is so widespread in this county — it does a comparable job at a fraction of the dead load.

None of that rules tile out. It does mean tile deserves a conversation about the structure carrying it, particularly on a building that was not originally designed around it.

How we handle it

  1. 01Confirm the fastening requirement for this address before pricing.
  2. 02Assess the underlayment rather than the appearance of the tile.
  3. 03Estimate salvage honestly and say that it is an estimate.
  4. 04Rebuild flashings instead of reseating tile over the old ones.

The salvage rate decides the economics of nearly every tile job. If most of the tile lifts cleanly and goes back down over new underlayment, that is a materially cheaper route than full replacement. If the tile is brittle or the profile is discontinued, that route closes, and it is much better to know that before the roof is opened.

Said plainly

Where we stop

We cannot promise a salvage percentage before tiles come up, and anyone who does has not lifted many. We will give an honest estimate from what we can see and be explicit that it is one.

FAQ

Common questions

My tiles look perfect but water is coming in. How?
Tile is a rain screen and is meant to let some water past. The underlayment beneath does the waterproofing and ages far faster than the tile does. Perfect-looking tile over failed underlayment is the standard pattern.
Is tile a bad idea in the Keys?
Not at all, and it asks more of the building than it does elsewhere — heavier, and requiring a fastening schedule set by the highest design pressures in Florida. It is a fair choice made deliberately.
Can my tiles be reused?
Often a good proportion, and nobody knows the true rate until they start coming up. Older and more brittle tile breaks more, and we will tell you what we expect and that it is an expectation.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.